A trail intercepts from the right.  Continue straight on the present trail.

19a

The trail splits prior to lock 1. Take the trail to the left over the canal bed.  The trail to the right is overgrown in places.

19b

This plaque designates this site as a National Civil Engineering  Landmark.  You will see it on the other side of lock 1.  Click on the picture to read the plaque.

19c

The trail crosses the canal just prior to the connection with the river trail.

20

 

Next

Home - Contents - Links